Work On Eastern Corridor Road to Start Soon – Dr Letsa WORK on the Eastern Corridor road project will start after the rainy season, Dr Archibald Yao Letsa, Volta Regional Minister has assured. He said at 03/10/2018 Read More
“Eastern Corridor Roads To Be Completed Before End Of 2020” – Roads Minister Assures The Minister for Roads and Highways, Hon. Kwasi Amoako-Atta, has assured the Chiefs and people of the Volta Region that, by the end of the 11/07/2018 Read More