{"id":7914,"date":"2025-11-18T18:25:00","date_gmt":"2025-11-18T18:25:00","guid":{"rendered":"https:\/\/voltaregion.gov.gh\/?p=7914"},"modified":"2026-01-12T11:27:32","modified_gmt":"2026-01-12T11:27:32","slug":"volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects","status":"publish","type":"post","link":"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/","title":{"rendered":"Volta Regional Minister Begins Two-Day Inspection of Eastern Corridor and Big Push Road Projects"},"content":{"rendered":"\n<p>The Volta Regional Minister, Hon. James Gunu, on Wednesday 18th November commenced a two-day inspection tour of major road projects along the Eastern Corridor, accompanied by Volta\u2019s Council of State Member, Hon. Gabriel Adovoe Kwabla Tanko Kwamigah-Atokple; representatives from the Volta Regional House of Chiefs; the Ecumenical and Zongo Regional Councils; and officials of the VRCC and Ghana Highway Authority<\/p>\n\n\n\n<p>The delegation first inspected the Have\u2013Hohoe Road (53.35km), which is being constructed by Greenhouse International Developers Ghana Limited, and later assessed work on the Asikuma\u2013Have Road (45km), currently being executed by First Sky Construction Limited.<\/p>\n\n\n\n<p>The team also visited the newly completed 67.5-metre Sayikope Bridge over the Aklakpa River, constructed by the Mobile Bridge Maintenance Unit of the Ghana Highway Authority.<\/p>\n\n\n\n<p>Under the Big Push initiative, the delegation continued to the Atimpoku\u2013Asikuma Road Project, where Lot 1 (17.5km) is being undertaken by USSUYA Ltd., Lot 2 (8.5km) by Dwahill Ltd., and the Asikuma\u2013Anyirawase Road Lot 3 (23.4km) by Ultra Nexus Ltd..<\/p>\n\n\n\n<p>Additionally, the Minister inspected works on the Asutsuare Junction, Volivo \u2013 Dorfor Adidome \u2013 Asikuma Junction Road (67km), which includes the construction of a new bridge over the Volta River. This project is being executed by CJIC, a Chinese construction firm.<\/p>\n\n\n\n<p>The Minister\u2019s tour continues today.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"625\" height=\"283\" data-attachment-id=\"7922\" data-permalink=\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/583980821_1252725433564730_5037873523810134394_n\/\" data-orig-file=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/583980821_1252725433564730_5037873523810134394_n.jpg?fit=1080%2C720&amp;ssl=1\" data-orig-size=\"1080,720\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"583980821_1252725433564730_5037873523810134394_n\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/583980821_1252725433564730_5037873523810134394_n.jpg?fit=620%2C510&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/583980821_1252725433564730_5037873523810134394_n.jpg?fit=625%2C283&amp;ssl=1\" data-id=\"7922\" src=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/583980821_1252725433564730_5037873523810134394_n.jpg?resize=625%2C283&#038;ssl=1\" alt=\"\" class=\"wp-image-7922\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"625\" height=\"283\" data-attachment-id=\"7923\" data-permalink=\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/585340352_1252725336898073_5616807562765884134_n\/\" data-orig-file=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/585340352_1252725336898073_5616807562765884134_n.jpg?fit=1080%2C720&amp;ssl=1\" data-orig-size=\"1080,720\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"585340352_1252725336898073_5616807562765884134_n\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/585340352_1252725336898073_5616807562765884134_n.jpg?fit=620%2C510&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/585340352_1252725336898073_5616807562765884134_n.jpg?fit=625%2C283&amp;ssl=1\" data-id=\"7923\" src=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/585340352_1252725336898073_5616807562765884134_n.jpg?resize=625%2C283&#038;ssl=1\" alt=\"\" class=\"wp-image-7923\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"625\" height=\"283\" data-attachment-id=\"7925\" data-permalink=\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/585830243_1252725293564744_7968905796032960159_n\/\" data-orig-file=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/585830243_1252725293564744_7968905796032960159_n.jpg?fit=1080%2C720&amp;ssl=1\" data-orig-size=\"1080,720\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"585830243_1252725293564744_7968905796032960159_n\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/585830243_1252725293564744_7968905796032960159_n.jpg?fit=620%2C510&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/585830243_1252725293564744_7968905796032960159_n.jpg?fit=625%2C283&amp;ssl=1\" data-id=\"7925\" src=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/585830243_1252725293564744_7968905796032960159_n.jpg?resize=625%2C283&#038;ssl=1\" alt=\"\" class=\"wp-image-7925\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"625\" height=\"283\" data-attachment-id=\"7926\" data-permalink=\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/584327480_1252725260231414_7540566903243253303_n\/\" data-orig-file=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/584327480_1252725260231414_7540566903243253303_n.jpg?fit=1080%2C720&amp;ssl=1\" data-orig-size=\"1080,720\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"584327480_1252725260231414_7540566903243253303_n\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/584327480_1252725260231414_7540566903243253303_n.jpg?fit=620%2C510&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/584327480_1252725260231414_7540566903243253303_n.jpg?fit=625%2C283&amp;ssl=1\" data-id=\"7926\" src=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/584327480_1252725260231414_7540566903243253303_n.jpg?resize=625%2C283&#038;ssl=1\" alt=\"\" class=\"wp-image-7926\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"625\" height=\"283\" data-attachment-id=\"7924\" data-permalink=\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/586100440_1252725143564759_1719778308028414080_n\/\" data-orig-file=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/586100440_1252725143564759_1719778308028414080_n.jpg?fit=1080%2C720&amp;ssl=1\" data-orig-size=\"1080,720\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"586100440_1252725143564759_1719778308028414080_n\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/586100440_1252725143564759_1719778308028414080_n.jpg?fit=620%2C510&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/586100440_1252725143564759_1719778308028414080_n.jpg?fit=625%2C283&amp;ssl=1\" data-id=\"7924\" src=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/586100440_1252725143564759_1719778308028414080_n.jpg?resize=625%2C283&#038;ssl=1\" alt=\"\" class=\"wp-image-7924\"\/><\/figure>\n\n\n\n\n\n\n\n\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The Volta Regional Minister, Hon. James Gunu, on Wednesday 18th November commenced a two-day inspection tour of major road projects along the Eastern Corridor, accompanied by Volta\u2019s Council of State Member, Hon. Gabriel Adovoe Kwabla Tanko Kwamigah-Atokple; representatives from the Volta Regional House of Chiefs; the Ecumenical and Zongo Regional Councils; and officials of the [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":7922,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[35],"tags":[],"class_list":["post-7914","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Volta Regional Minister Begins Two-Day Inspection of Eastern Corridor and Big Push Road Projects - VRCC<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Volta Regional Minister Begins Two-Day Inspection of Eastern Corridor and Big Push Road Projects - VRCC\" \/>\n<meta property=\"og:description\" content=\"The Volta Regional Minister, Hon. James Gunu, on Wednesday 18th November commenced a two-day inspection tour of major road projects along the Eastern Corridor, accompanied by Volta\u2019s Council of State Member, Hon. Gabriel Adovoe Kwabla Tanko Kwamigah-Atokple; representatives from the Volta Regional House of Chiefs; the Ecumenical and Zongo Regional Councils; and officials of the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/\" \/>\n<meta property=\"og:site_name\" content=\"VRCC\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/VoltaRCC\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-18T18:25:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-12T11:27:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/583980821_1252725433564730_5037873523810134394_n.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"VRCC Admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@VoltaRCC\" \/>\n<meta name=\"twitter:site\" content=\"@VoltaRCC\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"VRCC Admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/\"},\"author\":{\"name\":\"VRCC Admin\",\"@id\":\"https:\/\/voltaregion.gov.gh\/#\/schema\/person\/eaf9506344925bd3d360adaae05716cc\"},\"headline\":\"Volta Regional Minister Begins Two-Day Inspection of Eastern Corridor and Big Push Road Projects\",\"datePublished\":\"2025-11-18T18:25:00+00:00\",\"dateModified\":\"2026-01-12T11:27:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/\"},\"wordCount\":222,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/#organization\"},\"image\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/583980821_1252725433564730_5037873523810134394_n.jpg?fit=1080%2C720&ssl=1\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/\",\"url\":\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/\",\"name\":\"Volta Regional Minister Begins Two-Day Inspection of Eastern Corridor and Big Push Road Projects - VRCC\",\"isPartOf\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/583980821_1252725433564730_5037873523810134394_n.jpg?fit=1080%2C720&ssl=1\",\"datePublished\":\"2025-11-18T18:25:00+00:00\",\"dateModified\":\"2026-01-12T11:27:32+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#primaryimage\",\"url\":\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/583980821_1252725433564730_5037873523810134394_n.jpg?fit=1080%2C720&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/583980821_1252725433564730_5037873523810134394_n.jpg?fit=1080%2C720&ssl=1\",\"width\":1080,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/voltaregion.gov.gh\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Volta Regional Minister Begins Two-Day Inspection of Eastern Corridor and Big Push Road Projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/voltaregion.gov.gh\/#website\",\"url\":\"https:\/\/voltaregion.gov.gh\/\",\"name\":\"VRCC\",\"description\":\"Volta Regional Coordinating Council\",\"publisher\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/voltaregion.gov.gh\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/voltaregion.gov.gh\/#organization\",\"name\":\"Volta Regional Coordinating Council\",\"url\":\"https:\/\/voltaregion.gov.gh\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/voltaregion.gov.gh\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2018\/04\/VRCC-logo-Plus.png?fit=235%2C63\",\"contentUrl\":\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2018\/04\/VRCC-logo-Plus.png?fit=235%2C63\",\"width\":235,\"height\":63,\"caption\":\"Volta Regional Coordinating Council\"},\"image\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/VoltaRCC\",\"https:\/\/x.com\/VoltaRCC\",\"https:\/\/www.linkedin.com\/company\/voltarcc\/\",\"https:\/\/www.youtube.com\/channel\/UCjTL2wmaPR1g0l_Z32TXlqg\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/voltaregion.gov.gh\/#\/schema\/person\/eaf9506344925bd3d360adaae05716cc\",\"name\":\"VRCC Admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/voltaregion.gov.gh\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/e5506175452c7d8193c57520cb9caa8c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/e5506175452c7d8193c57520cb9caa8c?s=96&d=mm&r=g\",\"caption\":\"VRCC Admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Volta Regional Minister Begins Two-Day Inspection of Eastern Corridor and Big Push Road Projects - VRCC","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/","og_locale":"en_GB","og_type":"article","og_title":"Volta Regional Minister Begins Two-Day Inspection of Eastern Corridor and Big Push Road Projects - VRCC","og_description":"The Volta Regional Minister, Hon. James Gunu, on Wednesday 18th November commenced a two-day inspection tour of major road projects along the Eastern Corridor, accompanied by Volta\u2019s Council of State Member, Hon. Gabriel Adovoe Kwabla Tanko Kwamigah-Atokple; representatives from the Volta Regional House of Chiefs; the Ecumenical and Zongo Regional Councils; and officials of the [&hellip;]","og_url":"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/","og_site_name":"VRCC","article_publisher":"https:\/\/www.facebook.com\/VoltaRCC","article_published_time":"2025-11-18T18:25:00+00:00","article_modified_time":"2026-01-12T11:27:32+00:00","og_image":[{"width":1080,"height":720,"url":"https:\/\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/583980821_1252725433564730_5037873523810134394_n.jpg","type":"image\/jpeg"}],"author":"VRCC Admin","twitter_card":"summary_large_image","twitter_creator":"@VoltaRCC","twitter_site":"@VoltaRCC","twitter_misc":{"Written by":"VRCC Admin","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#article","isPartOf":{"@id":"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/"},"author":{"name":"VRCC Admin","@id":"https:\/\/voltaregion.gov.gh\/#\/schema\/person\/eaf9506344925bd3d360adaae05716cc"},"headline":"Volta Regional Minister Begins Two-Day Inspection of Eastern Corridor and Big Push Road Projects","datePublished":"2025-11-18T18:25:00+00:00","dateModified":"2026-01-12T11:27:32+00:00","mainEntityOfPage":{"@id":"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/"},"wordCount":222,"commentCount":0,"publisher":{"@id":"https:\/\/voltaregion.gov.gh\/#organization"},"image":{"@id":"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/583980821_1252725433564730_5037873523810134394_n.jpg?fit=1080%2C720&ssl=1","articleSection":["News"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/","url":"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/","name":"Volta Regional Minister Begins Two-Day Inspection of Eastern Corridor and Big Push Road Projects - VRCC","isPartOf":{"@id":"https:\/\/voltaregion.gov.gh\/#website"},"primaryImageOfPage":{"@id":"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#primaryimage"},"image":{"@id":"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/583980821_1252725433564730_5037873523810134394_n.jpg?fit=1080%2C720&ssl=1","datePublished":"2025-11-18T18:25:00+00:00","dateModified":"2026-01-12T11:27:32+00:00","breadcrumb":{"@id":"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#primaryimage","url":"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/583980821_1252725433564730_5037873523810134394_n.jpg?fit=1080%2C720&ssl=1","contentUrl":"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/583980821_1252725433564730_5037873523810134394_n.jpg?fit=1080%2C720&ssl=1","width":1080,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/voltaregion.gov.gh\/index.php\/volta-regional-minister-begins-two-day-inspection-of-eastern-corridor-and-big-push-road-projects\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/voltaregion.gov.gh\/"},{"@type":"ListItem","position":2,"name":"Volta Regional Minister Begins Two-Day Inspection of Eastern Corridor and Big Push Road Projects"}]},{"@type":"WebSite","@id":"https:\/\/voltaregion.gov.gh\/#website","url":"https:\/\/voltaregion.gov.gh\/","name":"VRCC","description":"Volta Regional Coordinating Council","publisher":{"@id":"https:\/\/voltaregion.gov.gh\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/voltaregion.gov.gh\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/voltaregion.gov.gh\/#organization","name":"Volta Regional Coordinating Council","url":"https:\/\/voltaregion.gov.gh\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/voltaregion.gov.gh\/#\/schema\/logo\/image\/","url":"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2018\/04\/VRCC-logo-Plus.png?fit=235%2C63","contentUrl":"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2018\/04\/VRCC-logo-Plus.png?fit=235%2C63","width":235,"height":63,"caption":"Volta Regional Coordinating Council"},"image":{"@id":"https:\/\/voltaregion.gov.gh\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/VoltaRCC","https:\/\/x.com\/VoltaRCC","https:\/\/www.linkedin.com\/company\/voltarcc\/","https:\/\/www.youtube.com\/channel\/UCjTL2wmaPR1g0l_Z32TXlqg"]},{"@type":"Person","@id":"https:\/\/voltaregion.gov.gh\/#\/schema\/person\/eaf9506344925bd3d360adaae05716cc","name":"VRCC Admin","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/voltaregion.gov.gh\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/e5506175452c7d8193c57520cb9caa8c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e5506175452c7d8193c57520cb9caa8c?s=96&d=mm&r=g","caption":"VRCC Admin"}}]}},"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2026\/01\/583980821_1252725433564730_5037873523810134394_n.jpg?fit=1080%2C720&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p9GRRn-23E","jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/7914","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/comments?post=7914"}],"version-history":[{"count":1,"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/7914\/revisions"}],"predecessor-version":[{"id":7927,"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/7914\/revisions\/7927"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/media\/7922"}],"wp:attachment":[{"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/media?parent=7914"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/categories?post=7914"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/tags?post=7914"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}