{"id":2596,"date":"2022-02-09T05:55:00","date_gmt":"2022-02-09T05:55:00","guid":{"rendered":"http:\/\/voltaregion.gov.gh\/?p=2596"},"modified":"2023-04-06T19:07:36","modified_gmt":"2023-04-06T19:07:36","slug":"work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road","status":"publish","type":"post","link":"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/","title":{"rendered":"WORK PROGRESSES STEADILY ON THE CONSTRUCTION OF 175M SPAN STEEL BRIDGE ON AGBENOXOE-DAFOR FEEDER ROAD"},"content":{"rendered":"\n<p>The construction of a 175m Span Steel Bridge over the Volta Lake on the Agbenoxoe-Dafor Feeder Road progresses steadily.&nbsp; As of February 2022 when the Regional Department embarked on a monitoring visit to the project, construction work was 83% complete.<\/p>\n\n\n\n<p>The project was awarded on the 31<sup>st<\/sup> of October 2017 and scheduled for completion under a revised completion date of &nbsp;&nbsp;16<sup>th<\/sup> March 2022. It is being undertaking by M\/s G.S. International Developers (Ghana) Limited and the supervising consultant is M\/s A Consult Ltd. &nbsp;<\/p>\n\n\n\n<p>Furthermore, the project is being executed as a collaboration between the Government of the Republic of Ghana and the Belgium Government in line with the vision of the Department of Feeder Roads of providing access to rural communities. The Belgium Government provided the steel components and the Government of Ghana is responsible for the construction of the abutments, piers and related works.<\/p>\n\n\n\n<p>The proposed bridge under construction crosses the backflow of the Volta Lake at the outskirt of Agbenoxoe on the Agbenoxoe-Dafor Feeder Road. The bridge, when completed is expected to eliminate the difficulty in commuting on the lake which was hitherto by the use of canoe.<\/p>\n\n\n\n<p>The project commencement delayed due to unstable water level which culminated in a revised completion date. That notwithstanding, the project from the assessment of the Department of Feeder Roads has progressed steadily.<\/p>\n\n\n\n<div class=\"wp-block-jetpack-slideshow aligncenter\" data-effect=\"slide\"><div class=\"wp-block-jetpack-slideshow_container swiper-container\"><ul class=\"wp-block-jetpack-slideshow_swiper-wrapper swiper-wrapper\"><li class=\"wp-block-jetpack-slideshow_slide swiper-slide\"><figure><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"625\" height=\"283\" alt=\"\" class=\"wp-block-jetpack-slideshow_image wp-image-2597\" data-id=\"2597\" src=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2023\/04\/1.jpg?resize=625%2C283&#038;ssl=1\"\/><\/figure><\/li><li class=\"wp-block-jetpack-slideshow_slide swiper-slide\"><figure><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"625\" height=\"369\" alt=\"\" class=\"wp-block-jetpack-slideshow_image wp-image-2598\" data-id=\"2598\" src=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2023\/04\/2.jpg?resize=625%2C369&#038;ssl=1\" srcset=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2023\/04\/2.jpg?w=1418&amp;ssl=1 1418w, https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2023\/04\/2.jpg?resize=768%2C454&amp;ssl=1 768w, https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2023\/04\/2.jpg?resize=624%2C369&amp;ssl=1 624w, https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2023\/04\/2.jpg?w=1250&amp;ssl=1 1250w\" sizes=\"auto, (max-width: 625px) 100vw, 625px\" \/><\/figure><\/li><\/ul><a class=\"wp-block-jetpack-slideshow_button-prev swiper-button-prev swiper-button-white\" role=\"button\"><\/a><a class=\"wp-block-jetpack-slideshow_button-next swiper-button-next swiper-button-white\" role=\"button\"><\/a><a aria-label=\"Pause Slideshow\" class=\"wp-block-jetpack-slideshow_button-pause\" role=\"button\"><\/a><div class=\"wp-block-jetpack-slideshow_pagination swiper-pagination swiper-pagination-white\"><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The construction of a 175m Span Steel Bridge over the Volta Lake on the Agbenoxoe-Dafor Feeder Road progresses steadily.&nbsp; As of February 2022 when the Regional Department embarked on a monitoring visit to the project, construction work was 83% complete. The project was awarded on the 31st of October 2017 and scheduled for completion under [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":2601,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[35],"tags":[],"class_list":["post-2596","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>WORK PROGRESSES STEADILY ON THE CONSTRUCTION OF 175M SPAN STEEL BRIDGE ON AGBENOXOE-DAFOR FEEDER ROAD - VRCC<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"WORK PROGRESSES STEADILY ON THE CONSTRUCTION OF 175M SPAN STEEL BRIDGE ON AGBENOXOE-DAFOR FEEDER ROAD - VRCC\" \/>\n<meta property=\"og:description\" content=\"The construction of a 175m Span Steel Bridge over the Volta Lake on the Agbenoxoe-Dafor Feeder Road progresses steadily.&nbsp; As of February 2022 when the Regional Department embarked on a monitoring visit to the project, construction work was 83% complete. The project was awarded on the 31st of October 2017 and scheduled for completion under [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/\" \/>\n<meta property=\"og:site_name\" content=\"VRCC\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/VoltaRCC\" \/>\n<meta property=\"article:published_time\" content=\"2022-02-09T05:55:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-04-06T19:07:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2022\/02\/3.jpg?fit=1431%2C935&ssl=1\" \/>\n\t<meta property=\"og:image:width\" content=\"1431\" \/>\n\t<meta property=\"og:image:height\" content=\"935\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Public Relations Office\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@VoltaRCC\" \/>\n<meta name=\"twitter:site\" content=\"@VoltaRCC\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Public Relations Office\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/\"},\"author\":{\"name\":\"Public Relations Office\",\"@id\":\"https:\/\/voltaregion.gov.gh\/#\/schema\/person\/3d065bf52a668947d2f6bc317a8418ed\"},\"headline\":\"WORK PROGRESSES STEADILY ON THE CONSTRUCTION OF 175M SPAN STEEL BRIDGE ON AGBENOXOE-DAFOR FEEDER ROAD\",\"datePublished\":\"2022-02-09T05:55:00+00:00\",\"dateModified\":\"2023-04-06T19:07:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/\"},\"wordCount\":240,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/#organization\"},\"image\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2022\/02\/3.jpg?fit=1431%2C935&ssl=1\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/\",\"url\":\"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/\",\"name\":\"WORK PROGRESSES STEADILY ON THE CONSTRUCTION OF 175M SPAN STEEL BRIDGE ON AGBENOXOE-DAFOR FEEDER ROAD - VRCC\",\"isPartOf\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2022\/02\/3.jpg?fit=1431%2C935&ssl=1\",\"datePublished\":\"2022-02-09T05:55:00+00:00\",\"dateModified\":\"2023-04-06T19:07:36+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#primaryimage\",\"url\":\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2022\/02\/3.jpg?fit=1431%2C935&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2022\/02\/3.jpg?fit=1431%2C935&ssl=1\",\"width\":1431,\"height\":935},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/voltaregion.gov.gh\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"WORK PROGRESSES STEADILY ON THE CONSTRUCTION OF 175M SPAN STEEL BRIDGE ON AGBENOXOE-DAFOR FEEDER ROAD\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/voltaregion.gov.gh\/#website\",\"url\":\"https:\/\/voltaregion.gov.gh\/\",\"name\":\"VRCC\",\"description\":\"Volta Regional Coordinating Council\",\"publisher\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/voltaregion.gov.gh\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/voltaregion.gov.gh\/#organization\",\"name\":\"Volta Regional Coordinating Council\",\"url\":\"https:\/\/voltaregion.gov.gh\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/voltaregion.gov.gh\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2018\/04\/VRCC-logo-Plus.png?fit=235%2C63\",\"contentUrl\":\"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2018\/04\/VRCC-logo-Plus.png?fit=235%2C63\",\"width\":235,\"height\":63,\"caption\":\"Volta Regional Coordinating Council\"},\"image\":{\"@id\":\"https:\/\/voltaregion.gov.gh\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/VoltaRCC\",\"https:\/\/x.com\/VoltaRCC\",\"https:\/\/www.linkedin.com\/company\/voltarcc\/\",\"https:\/\/www.youtube.com\/channel\/UCjTL2wmaPR1g0l_Z32TXlqg\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/voltaregion.gov.gh\/#\/schema\/person\/3d065bf52a668947d2f6bc317a8418ed\",\"name\":\"Public Relations Office\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/voltaregion.gov.gh\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/65caac285064da8054ca43ddcf91e91e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/65caac285064da8054ca43ddcf91e91e?s=96&d=mm&r=g\",\"caption\":\"Public Relations Office\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"WORK PROGRESSES STEADILY ON THE CONSTRUCTION OF 175M SPAN STEEL BRIDGE ON AGBENOXOE-DAFOR FEEDER ROAD - VRCC","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/","og_locale":"en_GB","og_type":"article","og_title":"WORK PROGRESSES STEADILY ON THE CONSTRUCTION OF 175M SPAN STEEL BRIDGE ON AGBENOXOE-DAFOR FEEDER ROAD - VRCC","og_description":"The construction of a 175m Span Steel Bridge over the Volta Lake on the Agbenoxoe-Dafor Feeder Road progresses steadily.&nbsp; As of February 2022 when the Regional Department embarked on a monitoring visit to the project, construction work was 83% complete. The project was awarded on the 31st of October 2017 and scheduled for completion under [&hellip;]","og_url":"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/","og_site_name":"VRCC","article_publisher":"https:\/\/www.facebook.com\/VoltaRCC","article_published_time":"2022-02-09T05:55:00+00:00","article_modified_time":"2023-04-06T19:07:36+00:00","og_image":[{"width":1431,"height":935,"url":"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2022\/02\/3.jpg?fit=1431%2C935&ssl=1","type":"image\/jpeg"}],"author":"Public Relations Office","twitter_card":"summary_large_image","twitter_creator":"@VoltaRCC","twitter_site":"@VoltaRCC","twitter_misc":{"Written by":"Public Relations Office","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#article","isPartOf":{"@id":"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/"},"author":{"name":"Public Relations Office","@id":"https:\/\/voltaregion.gov.gh\/#\/schema\/person\/3d065bf52a668947d2f6bc317a8418ed"},"headline":"WORK PROGRESSES STEADILY ON THE CONSTRUCTION OF 175M SPAN STEEL BRIDGE ON AGBENOXOE-DAFOR FEEDER ROAD","datePublished":"2022-02-09T05:55:00+00:00","dateModified":"2023-04-06T19:07:36+00:00","mainEntityOfPage":{"@id":"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/"},"wordCount":240,"commentCount":0,"publisher":{"@id":"https:\/\/voltaregion.gov.gh\/#organization"},"image":{"@id":"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2022\/02\/3.jpg?fit=1431%2C935&ssl=1","articleSection":["News"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/","url":"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/","name":"WORK PROGRESSES STEADILY ON THE CONSTRUCTION OF 175M SPAN STEEL BRIDGE ON AGBENOXOE-DAFOR FEEDER ROAD - VRCC","isPartOf":{"@id":"https:\/\/voltaregion.gov.gh\/#website"},"primaryImageOfPage":{"@id":"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#primaryimage"},"image":{"@id":"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2022\/02\/3.jpg?fit=1431%2C935&ssl=1","datePublished":"2022-02-09T05:55:00+00:00","dateModified":"2023-04-06T19:07:36+00:00","breadcrumb":{"@id":"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#primaryimage","url":"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2022\/02\/3.jpg?fit=1431%2C935&ssl=1","contentUrl":"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2022\/02\/3.jpg?fit=1431%2C935&ssl=1","width":1431,"height":935},{"@type":"BreadcrumbList","@id":"https:\/\/voltaregion.gov.gh\/index.php\/work-progresses-steadily-on-the-construction-of-175m-span-steel-bridge-on-agbenoxoe-dafor-feeder-road\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/voltaregion.gov.gh\/"},{"@type":"ListItem","position":2,"name":"WORK PROGRESSES STEADILY ON THE CONSTRUCTION OF 175M SPAN STEEL BRIDGE ON AGBENOXOE-DAFOR FEEDER ROAD"}]},{"@type":"WebSite","@id":"https:\/\/voltaregion.gov.gh\/#website","url":"https:\/\/voltaregion.gov.gh\/","name":"VRCC","description":"Volta Regional Coordinating Council","publisher":{"@id":"https:\/\/voltaregion.gov.gh\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/voltaregion.gov.gh\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/voltaregion.gov.gh\/#organization","name":"Volta Regional Coordinating Council","url":"https:\/\/voltaregion.gov.gh\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/voltaregion.gov.gh\/#\/schema\/logo\/image\/","url":"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2018\/04\/VRCC-logo-Plus.png?fit=235%2C63","contentUrl":"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2018\/04\/VRCC-logo-Plus.png?fit=235%2C63","width":235,"height":63,"caption":"Volta Regional Coordinating Council"},"image":{"@id":"https:\/\/voltaregion.gov.gh\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/VoltaRCC","https:\/\/x.com\/VoltaRCC","https:\/\/www.linkedin.com\/company\/voltarcc\/","https:\/\/www.youtube.com\/channel\/UCjTL2wmaPR1g0l_Z32TXlqg"]},{"@type":"Person","@id":"https:\/\/voltaregion.gov.gh\/#\/schema\/person\/3d065bf52a668947d2f6bc317a8418ed","name":"Public Relations Office","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/voltaregion.gov.gh\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/65caac285064da8054ca43ddcf91e91e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/65caac285064da8054ca43ddcf91e91e?s=96&d=mm&r=g","caption":"Public Relations Office"}}]}},"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/voltaregion.gov.gh\/wp-content\/uploads\/2022\/02\/3.jpg?fit=1431%2C935&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p9GRRn-FS","jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/2596","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/comments?post=2596"}],"version-history":[{"count":1,"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/2596\/revisions"}],"predecessor-version":[{"id":2599,"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/posts\/2596\/revisions\/2599"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/media\/2601"}],"wp:attachment":[{"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/media?parent=2596"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/categories?post=2596"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/voltaregion.gov.gh\/index.php\/wp-json\/wp\/v2\/tags?post=2596"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}